Courtyard of the Malt House
Construction type: Reconstruction
Brief Description: Construction of the courtyard of the Malt House and the passageway at the object no.117, Big Square Písek.
Important information about the project:
- Location: Courtyard of the Malt House
- Investor: The town Písek
- Designer: Ing.Arch.Vladimír Bouček
- Main contractor: KOČÍ a.s.
- Sub-contractors: Casta s.r.o., Volf - facades, Jiří Vála-windows
- Supervision: Ing. Josef Čížek
- Construction dates: July 07 - December 07
- Basic information about construction: Construction of the passageway in the present town house and the outlet end in the Big Square.Facelift, roof reconstruction and construction of the courtyard and the fountain with lighting. Green spaces.
- Master builder: Ing. Jan Jelínek
- Budget: 15,000,000 CZK
Malt-house reconstruction, 3rd period, 1st part of The Centre of illustration for children
Construction type: Reconstruction
Brief Description: Reconstruction of a conservation area Malt-house in Písek.
Important information about the project:
- Location: Písek
- Investor: Město Písek
- Designer: Adlatus
- Main contractor: KOČÍ a.s.
- Sub-contractors: Smola, Aba Stako, Šátava, klimaintop, Johnson Controls, Tramontáž, Elzako VM, Brož, Martan, Tesera, Zikon, Komerc
- Supervision: p. Kučera
- Construction dates: 7. 2005 - 5. 2006
- Basic information about construction: The whole reconstruction of a part of the Malt-house, new construction of the annex courtyard building.
- Master builder: Ing. Jelínek
- Budget: 64mil. Kč
- Interesting facts:
Malt-house reconstruction, I. II. period
Construction type: Reconstruction
Brief Description: Malt-house building is formed of 3 parts: left-hand part, central part and right-hand part with side wing. It is situated in the courtyard of the town hall in Písek.
Important information about the project:
- Location: Písek castle area
- Investor: Town Písek
- Designer: Adlatus
- Main contractor: KOČÍ a.s.
- Sub-contractors: Pradast, Zakládání staveb, Stavholding
- Supervision: Josef Kučera
- Construction dates: August 02 - August 04
- Basic information about construction: Demolition works on embedded constructions. New floor structures and staircases constructions. Roof repairs, curing and roof covering replacement.
- Master builder: M.Kolář
- Budget: 28,000,000 CZK